10-acre FarmBuilder Demo (Abeokuta North)
Promotional sample using your 10-acre context: zoning + access + water intent + phased capex. (No personal data.)
Decision summary
Goal: establish a phased farm that becomes an asset-acquisition engine (profit → land/housing/processing fund).
- Decision: Proceed (with conditions)
- Condition examples: access assurance, drainage plan, boundary clarity, neighbour relations
Farm zoning (v1)
A simple zoning approach that works even before precise imagery: separate access, production, water, and future infrastructure.
- Zone A: access + service corridor (tracks, turning)
- Zone B: production blocks (rotational)
- Zone C: water intent (capture/drain)
- Zone D: future expansion buffer
Water & drainage intent
Assume seasonal heavy rain. Use contour-aware drains and small retention points. Keep it conservative: start small, observe, scale.
- Perimeter drains where needed
- Low-point retention/soak areas
- Erosion control (grass, check dams)
- Avoid building in wet pockets
Phased capex plan
Start lean; validate first; scale when cashflow exists.
- Phase 1: clearing, access track, temporary water, fencing
- Phase 2: core production blocks + simple storage
- Phase 3: upgrades (irrigation, processing, staff)
Deliverables format
What a real FarmBuilder pack would include.
- Decision instrument + risk register
- Layout concept map (PDF)
- BOQ/Capex checklist (Excel later)
- Non-technical SOP checklist
Note: This is a promotional sample. Real work is customised to your land and goals.